Question about rolling tubes with a torque wrench instead of the impact
Got tired of guessing on a 60 tube boiler job in Gary and started torquing every roll to spec by hand, and my re-rolls went from 8 or 9 a job down to zero. Anyone else get pushback from the old guys for being slow, or is that just my crew?
How long did the old guys take on their rolls before they started giving you grief? Slower beats re-rolling any day when you're talking about a 60 tube job. Zero re-rolls is the number that matters at the end of the day.