0
One inspector in Columbus changed how I do control joints forever
Back in 2017 I was finishing a warehouse slab outside Columbus, about 18,000 square feet. The inspector walked up while I was cutting joints and said, 'You're spacing these too close, they're gonna look like a checkerboard.' I argued the spec sheet said 15 feet max. He pointed at the ambient temp and said, 'That's for summer, not a 40 degree morning.' He was right, the next day we had zero random cracking. I still adjust for season now, take it with a grain of salt, but has anyone else had an inspector teach them something that actually saved a pour?
1 comments
Log in to join the discussion
Log In1 Comment
charlescraig3d ago
Man, that inspector earned his pay that day. Same thing happened to me on a tilt-up panel job back in 2019, had an old county guy tell me to back off my joint spacing on a cool, damp morning. I was dead set on following the book, but he said the concrete is gonna shrink slower in that weather, so you need fewer cuts, not more. Let me tell you, the next spring we saw some hairline stuff on the slab next door that was done by another crew, but ours stayed clean. I still look at the forecast and adjust my layout every single time now, even if it feels like I'm second-guessing the spec. That little piece of advice has saved me more callbacks than any other trick I've picked up.
4