Pouring a slab in August heat and watched it crust over before I could finish troweling
Job site was out in Bakersfield, 105 degrees and dry as a bone. I mixed the load a little too stiff thinking it would hold up better. By the time I got the bull float across, the edges were already setting up. Had to hit it with a spray bottle and work fast to save the surface. Ended up with a decent finish but it took twice as long. Anybody else mess up a timing window like that?
3 comments
Log in to join the discussion
Log In3 Comments
phoenixw111mo ago
A wet sponge on a stick beats a spray bottle every time, slows the set just enough.
6
hall.joel1mo ago
Threw 2 gallons of ice in the mix once on a 108 degree day in Fresno and it bought me maybe 10 extra minutes. Your mileage may vary but a light mist coat and a clean magnesium trowel can save it if you catch it fast enough.
5
vera_robinson361mo ago
Wait, did you seriously just toss 2 whole gallons of ice into a concrete mix on a 108 degree day? That's insane, I can't even imagine the look on the foreman's face if he saw you dumping that much ice in. I've tried a bag of crushed ice on a hot day before and it melted so fast I barely noticed a difference. You must have been working like crazy to get it all placed in that 10 minute window.
2