💡
16

Pulled too much sand on a job in Tampa Bay and nearly lost the cutterhead

I was working in Tampa Bay last month and kept pushing the suction past 80% thinking more material meant faster work. Buried the cutterhead in a sandbar and had to call a dive team to dig it out, cost the company $2,400. Any of you guys run into balance issues between speed and overloading?
3 comments

Log in to join the discussion

Log In
3 Comments
sandra_bennett59
Dumb luck running that high in soft sand, didn't you figure?
6
rowan969
rowan96927d ago
That rush to go faster usually ends up costing way more time in the long run.
6
jasonallen
jasonallen27d ago
Ever tried backing off to 60% suction and letting the swing do the work?
5