I know everyone says to always glue down engineered plank over concrete, but that 1,200 sq ft glue-down job in a humid basement took me 4 days instead of 2 because the adhesive just wouldn't set right. | Flooring Installers - Thought Shares
I know everyone says to always glue down engineered plank over concrete, but that 1,200 sq ft glue-down job in a humid basement took me 4 days instead of 2 because the adhesive just wouldn't set right.
Has anyone else had this happen in a high-moisture area, and what's your go-to method now?